On-Site Sewage Planning Materials

What you will need:

If you ARE NOT using a Professional Design:

  • Application
  • Technical Sheet
  • Site Evaluation report
  • Design drawing to scale
  • Directions to the site
  • Fee

If you ARE using a Professional Design:

  • Application
  • Report by either Professional Engineer or Registered Sanitarian
  • Site Evaluation report
  • Signed and Sealed design drawing of proposed system
  • Written variances, with supporting language justifying that variance
  • If a commercial design, then supporting documents such as lab reports showing BOD5 sample results, or manufacturers recommended BOD5 loading rates, etc
  • Maintenance Agreement
  • Certification of OSSF Requiring Maintenance, certified copy recorded in county of property location
  • Directions to the site
  • Fee